Projects

Krause Gateway Center

  • Location : Downtown Des Moines, IA
  • Owner : Kum & Go, L.C.
  • 40′ Depth Excavation with H-Pile & Lagging ERS
  • 82,000 CY of Excavated Export Material
  • 25,500 Ton of Granular Backfill & Staging Material
  • 5,200 LF of Storm, Water, & Sanitary Sewer
  • Installation of 45,000 Gal Precast Concrete Underground Storm Detention Basin
  • Detailed Footing & Pile Cap Excavation

Grand Avenue Widening

  • Location : West Des Moines, IA
  • Owner : City of West Des Moines
  • 1.9 Mile Roadway Reconstruction Project.
  • 452 LF RCB Box Culvert Installation 50′ Depth.
  • 174,000 CY Contractor Furnished Borrow
  • 203,500 CY of Class 10 Excavation
  • 59,090 SY of 9″ PCC Paving
  • 7,111 LF of Storm Sewer & Water Main Installation

156th Street Improvements

  • Location : Urbandale, IA
  • Owner : City of Urbandale
  • 1 mile roadway widening project.
  • Bridge Demolition & Reconstruction
  • RCB Box Culvert
  • 36,000 SY of 8″ PCC Paving
  • 185,000 CY of Imported Fill Material
  • 11,500 LF of Storm, Water, & Sanitary Sewer Utility Installation